I am in the middle of building a reactor and was wondering what is the best way to control dosing kalk into my sump. If I ran it off my ATO, then there might be a possibility of overdosing so I was thinking of maybe putting a Tee right after the pump for the top off. One side of the tee would go through the
kalk reactor and the other side would go straight into the sump. I would also be putting a valve between the the Tee and the kalk reactor and another one between the Tee and the sump. What do u guys think? Any recommendations?