Hello Everyone.
Long overdue update - We have been busy getting ready for the weddding - 3 weeks and a few days....anyways.
At the first water test, two days after filling, a leak developed
I removed all the sillycone and while doing so, found a corner with uncured material. I had let it cure for 3 days, however, it was still sticky with the typical smell of ammonia. The LFS (just found them, seem to be quite knowledgeable) thinks the sillycone may be a little old. I tried again and had success.
I've build my overflow box, installed it. Installed the standpipe, and some of the return pipes inside of the overflow.
here is a pic inside the overflow:
Now it was time for the stand - I love the look of oak, but not the expense. the outside of the stand is 1/4" oak plywood.
1st, the essentials:
Make the top and bottom (of the bottom) (and the Buddy posing)
Make the top look nice and allow plumbing through:
Install some uprights and other supporting members:
Dry fit test (one of many) with some internal panels installed:
Install the front oak panel - notice the sound deadening insulation on the sides. the stant has this between all the external and internal walls:
All sides installed - door rough-cut and edges (two front ones) prepared for edging using a router: